Tuesday, 13 October 2026Price: free
Majd meglátjuk

Promises

100 concrete commitments of the Tisza programme, checked against official documents.

Last checked: 13 October 2026

23/ 100 · Weighted score · Methodology

Changes per week newly fulfilled newly in progress other score
09 030 AprMayJunJulAugSeptOct week of 6 April 2026: 0 newly fulfilled, 0 newly in progress, 0 other · score 0 week of 13 April 2026: 0 newly fulfilled, 0 newly in progress, 0 other · score 0 week of 20 April 2026: 0 newly fulfilled, 0 newly in progress, 0 other · score 0 week of 27 April 2026: 0 newly fulfilled, 0 newly in progress, 0 other · score 0 week of 4 May 2026: 1 newly fulfilled, 2 newly in progress, 0 other · score 1 (B03, H01, O02) week of 11 May 2026: 2 newly fulfilled, 7 newly in progress, 0 other · score 4 (A03, E01, E03, E05, E08, H01, T01, T04, V01) week of 18 May 2026: 0 newly fulfilled, 5 newly in progress, 0 other · score 5 (B04, B09, K01, T05, Z03) week of 25 May 2026: 1 newly fulfilled, 2 newly in progress, 0 other · score 7 (H05, K01, O05) week of 1 June 2026: 1 newly fulfilled, 4 newly in progress, 0 other · score 9 (G01, Y01, Y02, Y03, Y04) week of 8 June 2026: 0 newly fulfilled, 1 newly in progress, 0 other · score 9 (O04) week of 15 June 2026: 1 newly fulfilled, 1 newly in progress, 0 other · score 11 (B01, O06) week of 22 June 2026: 0 newly fulfilled, 2 newly in progress, 0 other · score 12 (B05, B08) week of 29 June 2026: 1 newly fulfilled, 2 newly in progress, 0 other · score 13 (B06, C01, H03) week of 6 July 2026: 0 newly fulfilled, 1 newly in progress, 0 other · score 14 (R01) week of 13 July 2026: 0 newly fulfilled, 3 newly in progress, 0 other · score 15 (A08, B02, Z01) week of 20 July 2026: 1 newly fulfilled, 1 newly in progress, 0 other · score 16 (A04, F04) week of 27 July 2026: 0 newly fulfilled, 1 newly in progress, 0 other · score 17 (T02) week of 3 August 2026: 0 newly fulfilled, 1 newly in progress, 0 other · score 17 (H04) week of 10 August 2026: 1 newly fulfilled, 0 newly in progress, 0 other · score 18 (A04) week of 17 August 2026: 0 newly fulfilled, 0 newly in progress, 0 other · score 18 week of 24 August 2026: 1 newly fulfilled, 1 newly in progress, 0 other · score 19 (R02, T02) week of 31 August 2026: 1 newly fulfilled, 2 newly in progress, 0 other · score 21 (A05, H10, L01) week of 7 September 2026: 1 newly fulfilled, 0 newly in progress, 0 other · score 21 (Z01) week of 14 September 2026: 0 newly fulfilled, 1 newly in progress, 0 other · score 22 (I01) week of 21 September 2026: 0 newly fulfilled, 1 newly in progress, 0 other · score 22 (T03) week of 28 September 2026: 0 newly fulfilled, 1 newly in progress, 0 other · score 22 (Z04) week of 5 October 2026: 0 newly fulfilled, 3 newly in progress, 0 other · score 23 (A07, N03, N04) week of 12 October 2026: 0 newly fulfilled, 0 newly in progress, 1 other · score 23 (Y04)

First measures

◐ in progress · tokenchanged: ●●○ · E01 · programme p. 10

After a national security review, summaries of government meetings from 2010–2026 are published.

“After a national security review, we will publish the summaries of government meetings between 2010 and 2026.”

Publication has not happened yet.

Evidence (1)
History (1)
  1. ↗ ◐ in progress · token
○ no data●●○ · E02 · programme p. 10

The full files on the central bank's asset management under governor György Matolcsy are published.

“We will publish all files related to the Hungarian National Bank's asset management under governor György Matolcsy.”

A parliamentary inquiry committee was set up, but there is no document on publishing the files.

Related documents (2)
◐ in progress · tokenchanged: ●●○ · E03 · programme p. 10

Secret government resolutions and secret domestic and international contracts are uncovered and published.

“We will uncover the hidden reality and present it to the public: the real state of the economy, health care and education, the secret government resolutions, domestic and international contracts”

A review was ordered; there is no comprehensive publication yet.

Evidence (2)
History (1)
  1. ↗ ◐ in progress · token
– not raisedchanged: ●●○ · E04 · programme p. 10

A state property register is drawn up and made public.

“We will draw up the state property register and uncover and make public Hungary's real state assets.”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification
✔ fulfilled · partialchanged: ●○○ · E05 · programme p. 10

The education, health, justice and finance ministers get a veto in government decision-making.

“The education minister, the health minister, the justice minister and the finance minister will get a veto in the government's decision-making mechanism.”

The veto is in a government decree, not in an act.

Evidence (1)
History (1)
  1. ↗ ✔ fulfilled · partial
– not raisedchanged: ●○○ · E06 · programme p. 10

A report is prepared on the influence of non-allied countries in Hungary.

“We will prepare a report on the extent of non-allied foreign influence in terms of national security and the national economy.”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification
○ no data●●○ · E07 · programme p. 11

Right after the government is formed, public media news broadcasting is suspended and only restarted once conditions for independent operation exist.

“After forming the government we will immediately suspend public media news broadcasting and restart it only after we have created the conditions for independent, objective news.”

Decisions affecting public media were made, but there is no document on suspending the news service.

Related documents (4)
◐ in progress · partialchanged: ●●○ · E08 · programme p. 11

The informer files (state security files) are opened.

“We will open the informer files.”

The act was published, but its main part is not yet in force; it may change to fulfilled at the update after 20 October 2026.

Evidence (3)
Related documents (2)
History (1)
  1. ↗ ◐ in progress · partial

1.1 Economic development

✔ fulfilled · fullchanged: ●●○ · G01 · programme p. 37

From 1 June 2026, bringing in guest workers from outside Europe is suspended.

“From 1 June 2026 we will suspend bringing in guest workers from outside Europe”

The decree was published on 5 June 2026; the programme mentioned 1 June and promised a suspension – the decree abolished the permit type.

Evidence (1)
Related documents (1)
History (1)
  1. ↗ ✔ fulfilled · full
– not raisedchanged: ●●○ · G02 · programme p. 37

Support linked to the tourist tax (IFA) is given back to municipalities.

“We will give the IFA support back to municipalities”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification
○ no data●●○ · G03 · programme p. 37

Funding for innovation rises at least one and a half times in four years.

“In four years we will raise funding for innovation at least one and a half times.”

1.2 Tax cuts

– not raisedchanged: ●●● · A01 · programme p. 54

Personal income tax on the minimum wage falls from 15% to 9% (through a tax credit).

“We will cut the tax on the minimum wage from 15 percent to 9 percent.”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification
– not raisedchanged: ●●● · A02 · programme p. 56

People earning below the median wage (about HUF 625,000 gross a month) pay less personal income tax.

“Those earning below the median wage (currently up to HUF 625,000 gross monthly income) will also pay less tax”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification
◐ in progress · tokenchanged: ●●● · A03 · programme p. 54

A 1% annual wealth tax on the part of wealth above HUF 1 billion.

“We will introduce a 1% wealth tax on fortunes above one billion forints.”

Only a draft; the rates differ from the programme (1.5% above HUF 100 billion).

Evidence (2)
History (1)
  1. ↗ ◐ in progress · token
✔ fulfilled · fullchanged: ●●○ · A04 · programme p. 54

VAT on prescription medicines will be 0%.

“We will cut VAT on prescription medicines to 0%.”

The 0% VAT has applied since 1 September 2026.

Evidence (2)
History (2)
  1. ↗ ◐ in progress
  2. ↗ ✔ fulfilled · full
✔ fulfilled · fullchanged: ●●○ · A05 · programme p. 54

VAT on firewood falls to 5%.

“We will reduce VAT on firewood and healthy food to 5%.”

The 5% VAT has applied since 15 September 2026.

Evidence (1)
History (1)
  1. ↗ ✔ fulfilled · full
– not raisedchanged: ●●● · A06 · programme p. 218

VAT on healthy food falls to 5%.

“We will cut VAT on healthy food to 5%”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification
◐ in progress · partialchanged: ●●○ · A08 · programme p. 56

The corporate tax relief (TAO) system will be reshaped.

“We will reshape the tangled, politicised system of TAO tax reliefs.”

A partial change, not a full overhaul.

Evidence (2)
History (1)
  1. ↗ ◐ in progress · partial

1.4 Utility costs

◐ in progress · partialchanged: ●●● · R01 · programme p. 67

Utility price cuts are kept and extended on a social basis.

“We will keep utility price cuts and extend them on a social basis.”

Utility price cuts remained; there is no document on a social-based extension.

Evidence (2)
History (1)
  1. ↗ ◐ in progress · partial
◐ in progress · partialchanged: ●●○ · R02 · programme p. 67

The social firewood budget is doubled and made available to municipalities with over 5,000 people too.

“we will double the social firewood budget and make it available to municipalities with more than 5,000 people too.”

The budget doubled; there is no data on extending it to municipalities with over 5,000 people.

Evidence (1)
History (1)
  1. ↗ ◐ in progress · partial

1.5 Infrastructure

◐ in progress · partialchanged: ●●○ · I01 · programme p. 72

The 35-year motorway concession contract is reviewed, and tolls are cut.

“We will review the 35-year concession contract and cut tolls.”

There is no document on cutting tolls.

Evidence (1)
Related documents (1)
History (1)
  1. ↗ ◐ in progress · partial
– not raisedchanged: ●●○ · I02 · programme p. 72

A national pothole repair programme is launched, and spending on public road maintenance is doubled.

“We will launch a national pothole repair and comprehensive road development programme and double spending on maintaining and renovating public roads.”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification
– not raisedchanged: ●●○ · I03 · programme p. 72

The M200–M8 expressway linking the M1 with Kecskemét is built, and work starts on the M9 southern ring road.

“We will build the M200–M8 expressways crossing the middle of the country and linking the M1 with Kecskemét”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification
– not raisedchanged: ●●○ · I04 · programme p. 72

The Galvani Bridge and the Soroksár Danube Bridge are built in Budapest, and a new Tisza bridge in Szeged.

“In Budapest we will build the Galvani Bridge and the Soroksár Danube Bridge, with rail transport. In Szeged we will build a new Tisza bridge”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification

1.6 Housing

◐ in progress · tokenchanged: ●●● · L01 · programme p. 86

A national rental housing and housing cooperative programme is launched, with tens of thousands of new rental homes.

“We will launch a national social and market-based rental housing and housing cooperative programme and build tens of thousands of new rental homes.”

Preparation; there is no decision yet on building rental homes.

Evidence (1)
History (1)
  1. ↗ ◐ in progress · token
– not raisedchanged: ●●○ · L02 · programme p. 86

20,000 new places in modern care homes for older people.

“We will create 20,000 new places for pensioners in modern care homes.”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification

2.3 Immigration

2.4 Foreign policy

✔ fulfilled · fullchanged: ●●○ · K01 · programme p. 107

The exit from the International Criminal Court is stopped; Hungary remains a member.

“We will stop the process of leaving the International Criminal Court and remain full members of the organisation.”

A law withdrew the exit.

Evidence (2)
Related documents (1)
History (2)
  1. ↗ ◐ in progress
  2. ↗ ✔ fulfilled · full

2.5 Hungarians abroad

○ no data●●○ · D01 · programme p. 109

The "Your homeland awaits!" programme is launched to help Hungarians abroad return (200,000 people in 8 years).

“We will launch the Your homeland awaits! programme”

2.6 Anti-corruption

◐ in progress · tokenchanged: ●●● · T01 · programme p. 114

Hungary joins the European Public Prosecutor's Office.

“We will join the European Public Prosecutor's Office.”

There is no document on completing accession.

Evidence (1)
History (1)
  1. ↗ ◐ in progress · token
✔ fulfilled · fullchanged: ●●● · T02 · programme p. 114

A National Asset Recovery and Protection Office is set up to recover stolen public assets.

“We will set up the National Asset Recovery and Protection Office”

The office was created by law and its president elected.

Evidence (2)
Related documents (2)
History (2)
  1. ↗ ◐ in progress
  2. ↗ ✔ fulfilled · full
◐ in progress · tokenchanged: ●●○ · T03 · programme p. 114

A wealth check going back 20 years for MPs, political leaders and their family members.

“We will introduce a wealth check going back 20 years for MPs, political leaders and their close family members.”

The draft covers mandates ended in the past 5 years, not 20 years.

Evidence (1)
History (1)
  1. ↗ ◐ in progress · token
◐ in progress · partialchanged: ●●○ · T04 · programme p. 114

The anonymity of owners behind private equity funds is ended, and trust asset management is reviewed.

“We will end the anonymity of the real owners behind private equity funds and review the system of trust asset managers.”

No rule ending owner anonymity has been published.

Evidence (2)
History (1)
  1. ↗ ◐ in progress · partial
◐ in progress · tokenchanged: ●●○ · T05 · programme p. 116

The big scandals of past years are investigated (e.g. concessions, MNB foundations, Paks II, Budapest–Belgrade railway, ventilator purchases).

“We will investigate the corruption scandals and obvious breaches of law of past years (e.g. decades-long concessions, government propaganda spending, MNB foundations, private equity funds, PAKS II and…”

Inquiries were ordered; there is no document on their results.

Evidence (5)
Related documents (1)
History (1)
  1. ↗ ◐ in progress · token
– not raisedchanged: ●●● · T06 · programme p. 117

A Corruption Prevention Authority independent of the government is set up.

“We will build a state system to prevent corruption, headed by a Corruption Prevention Authority independent of the government.”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification

2.7 Rule of law

✔ fulfilled · partialchanged: ●●● · B01 · programme p. 118

Anyone can be prime minister for at most two terms.

“We will limit the prime minister's mandate to two terms.”

The programme promised two terms; the rule adopted is an 8-year total limit.

Evidence (1)
History (1)
  1. ↗ ✔ fulfilled · partial
◐ in progress · tokenchanged: ●●● · B02 · programme p. 118

A new draft constitution will be drawn up through broad public consultation.

“Through broad public consultation we will draw up a draft constitution that reunites the nation.”

The Fundamental Law was amended; there is no document on a draft new constitution.

Evidence (1)
History (1)
  1. ↗ ◐ in progress · token
◐ in progress · partialchanged: ●●● · B03 · programme p. 118

Government by decree (governing through emergency decrees) will end.

“We will end government by decree.”

The emergency decrees lapsed on 14 May 2026, but the crisis situation due to mass immigration (144/2026.) still stands, so this is cautiously in progress.

Evidence (1)
Related documents (1)
History (1)
  1. ↗ ◐ in progress · partial
◐ in progress · tokenchanged: ●●○ · B04 · programme p. 118

Court enforcement and liquidation are taken into state hands under the courts; the chamber of bailiffs is abolished.

“We will place enforcement and liquidation under the courts.”

No act has been adopted yet.

Evidence (2)
Related documents (1)
History (1)
  1. ↗ ◐ in progress · token
◐ in progress · partialchanged: ●●● · B05 · programme p. 118

The independence of public media is restored and a new media law is adopted.

“We will restore the independence and party-political neutrality of public media and adopt a new media law.”

An amendment was made, but no new media law.

Evidence (2)
Related documents (1)
History (1)
  1. ↗ ◐ in progress · partial
✔ fulfilled · fullchanged: ●○○ · B06 · programme p. 120

The Sovereignty Protection Office is abolished.

“We will abolish the Sovereignty Protection Office.”

The office was abolished by law.

Evidence (1)
History (1)
  1. ↗ ✔ fulfilled · full
◐ in progress · partialchanged: ●●○ · B08 · programme p. 120

Parliament's rules of procedure are reviewed, with legal remedy against the Speaker's decisions.

“We will review Parliament's rules of procedure and provide legal remedy against the Speaker's decisions.”

There is no data on legal remedy against the Speaker's decisions.

Evidence (2)
History (1)
  1. ↗ ◐ in progress · partial
◐ in progress · tokenchanged: ●●○ · B09 · programme p. 121

The range of mandatory notary services is narrowed, and a cap is introduced on notary fees.

“We will significantly narrow the range of notary services that must be used, and introduce a cap on fees for notarial work”

Only a review was ordered.

Evidence (1)
History (1)
  1. ↗ ◐ in progress · token
– not raisedchanged: ●○○ · B10 · programme p. 119

The Pegasus surveillance scandal is investigated and its details made public.

“We will investigate and make public every detail of the surveillance scandal linked to the Pegasus software.”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification

2.8 Public administration and local government

✔ fulfilled · fullchanged: ●○○ · Z01 · programme p. 125

The name "vármegye" and the post of "főispán" are abolished.

“we will abolish the name vármegye and the post of főispán.”

The Fundamental Law and over 170 laws now say county and government commissioner.

Evidence (2)
History (2)
  1. ↗ ◐ in progress
  2. ↗ ✔ fulfilled · full
– not raisedchanged: ●○○ · Z02 · programme p. 125

The convenience fee for state and municipal services is abolished.

“We will abolish the convenience fee for state or municipal services.”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification
◐ in progress · tokenchanged: ●●○ · Z03 · programme p. 125

Tasks, powers, institutions and funds taken from municipalities are given back.

“We will give back to municipalities the tasks, powers and institutions taken away earlier, together with the necessary funds.”

Only a review was ordered.

Evidence (1)
Related documents (1)
History (1)
  1. ↗ ◐ in progress · token
◐ in progress · partialchanged: ●●○ · Z04 · programme p. 125

A Budapest Act is adopted on cooperation between the government and the capital.

“We will adopt a Budapest Act setting the framework for positive, partner-like cooperation between any government and the capital.”

There is no separate Budapest Act yet.

Evidence (1)
Related documents (1)
History (1)
  1. ↗ ◐ in progress · partial
○ no data●●○ · Z05 · programme p. 127

Real professional performance evaluation replaces needless paperwork in public administration.

“We will introduce real professional performance evaluation that is not a needless administrative burden”

Teachers' performance evaluation was reshaped (1179/2026.), but this promise concerns public administration.

2.9 Civil society and churches

◐ in progress · tokenchanged: ●●○ · C01 · programme p. 132

Public funding of fake civil organisations is stopped immediately.

“We will make the path of public money traceable everywhere and immediately stop funding fake civil organisations.”

Only an audit was ordered.

Evidence (1)
History (1)
  1. ↗ ◐ in progress · token

3.1 Health

✔ fulfilled · fullchanged: ●○○ · H01 · programme p. 138

A separate Ministry of Health is set up.

“We will set up a separate Ministry of Health”

The separate ministry has existed since 13 May 2026.

Evidence (2)
History (2)
  1. ↗ ◐ in progress
  2. ↗ ✔ fulfilled · full
○ no data●●● · H02 · programme p. 138

At least HUF 500 billion more state money for health care every year.

“every year we will provide at least HUF 500 billion in extra funding for public health care.”
◐ in progress · tokenchanged: ●●● · H03 · programme p. 138

By the end of 2027, hospital waiting lists will be at most 6 months, and 2 months in outpatient care.

“By the end of 2027 we will cut waiting lists to at most 6 months in inpatient care and 2 months in outpatient care.”

The deadline is the end of 2027.

Evidence (2)
History (1)
  1. ↗ ◐ in progress · token
◐ in progress · partialchanged: ●●○ · H04 · programme p. 138

Public health and screening programmes are reorganised.

“We will reorganise public health and the screening programmes”

Pregnancy screening was expanded; the rest is a draft or an audit.

Evidence (3)
History (1)
  1. ↗ ◐ in progress · partial
– not raisedchanged: ●●○ · H06 · programme p. 138

By the end of 2027, ambulances arrive within 15 minutes in every region.

“By the end of 2027 we will ensure in every region that ambulances arrive on the scene within 15 minutes.”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification
○ no data●●● · H07 · programme p. 138

The nurse-to-doctor ratio is raised from 1.6 to 2.5.

“We will raise the nurse–doctor ratio from 1.6 to 2.5.”
○ no data●●● · H08 · programme p. 138

Pay reform in non-doctor health care jobs (health professionals).

“We will carry out a pay reform in non-doctor jobs.”
– not raisedchanged: ●●○ · H09 · programme p. 138

A super-hospital is developed in every region.

“We will develop a super-hospital in every region, based on the clinical centres.”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification
◐ in progress · tokenchanged: ●●○ · H10 · programme p. 147

The powers of the Hungarian Medical Chamber are restored and strengthened.

“We will restore and strengthen the powers of the Hungarian Medical Chamber.”

Only a draft so far.

Evidence (1)
History (1)
  1. ↗ ◐ in progress · token

3.2 Pensions

○ no data●●● · N01 · programme p. 148

The 13th and 14th month pensions are kept.

“We will keep the 13th and 14th month pensions.”

There is no document abolishing the 13th and 14th month pensions; keeping them needs no new decision, so it cannot be confirmed from the monitored sources.

– not raisedchanged: ●●○ · N02 · programme p. 148

A pensioner SZÉP card with up to HUF 200,000 support a year.

“We will introduce the pensioner SZÉP card with support of up to HUF 200,000 a year.”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification
◐ in progress · tokenchanged: ●●● · N03 · programme p. 148

Nobody's old-age or disability pension can be less than HUF 120,000 a month.

“We guarantee that nobody can receive less than HUF 120,000 a month in old-age and disability pension”

Only a draft.

Evidence (1)
History (1)
  1. ↗ ◐ in progress · token
◐ in progress · tokenchanged: ●●○ · N04 · programme p. 148

The old-age allowance is doubled.

“We will double the old-age allowance.”

Only a draft.

Evidence (1)
History (1)
  1. ↗ ◐ in progress · token
– not raisedchanged: ●●○ · N05 · programme p. 148

The carer's allowance (home care allowance) is raised by 50%.

“We will raise home care allowances by 50%.”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification

3.3 Child protection

◐ in progress · tokenchanged: ●●○ · V01 · programme p. 151

Crimes committed in child protection over past decades are uncovered (with a parliamentary inquiry committee).

“We will uncover the crimes committed in child protection over past decades.”

An investigation and a committee; no results yet.

Evidence (2)
History (1)
  1. ↗ ◐ in progress · token
○ no data●●○ · V02 · programme p. 151

Victims abused in child protection receive full compensation.

“We will provide full material and moral compensation for victims who suffered abuse in child protection.”

A new Child Protection Fund was created, but there is no document on compensation.

Related documents (1)
– not raisedchanged: ●●○ · V03 · programme p. 151

Pay of child protection workers rises by 25% immediately and is linked to inflation.

“We will immediately raise the pay of workers in the sector by 25% and link it to inflation.”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification
○ no data●●○ · V04 · programme p. 151

The operating budget of child protection rises by 20%.

“We will strengthen the child protection system and raise the sector's operating budget by 20%”

A new Child Protection Fund with HUF 1 billion; there is no data on a 20% rise in the operating budget.

Related documents (1)

3.4 Family

– not raisedchanged: ●●● · F01 · programme p. 158

Family allowance and maternity support are doubled.

“We will double family allowance and maternity support.”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification
– not raisedchanged: ●○○ · F02 · programme p. 158

Every newborn gets a HUF 50,000 "My child is born!" baby kit.

“When every baby is born we will provide a "My child is born!" baby kit worth HUF 50,000.”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification
– not raisedchanged: ●●● · F03 · programme p. 158

GYES and GYET childcare allowances are doubled.

“We will double GYES and GYET.”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification
✔ fulfilled · fullchanged: ●●○ · F04 · programme p. 158

A HUF 100,000 school-start support every year for those in need.

“Every year we will give those in need a school-start support worth HUF 100,000.”

A decree and amended laws introduced the HUF 100,000 allowance.

Evidence (2)
Related documents (1)
History (1)
  1. ↗ ✔ fulfilled · full
– not raisedchanged: ●●○ · F05 · programme p. 158

CSOK and CSOK Plus family housing support need not be repaid in case of divorce.

“We guarantee that CSOK and CSOK Plus need not be repaid in case of divorce.”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification
– not raisedchanged: ●●○ · F06 · programme p. 158

Paternity leave rises to three weeks.

“we will extend paternity leave to 3 weeks.”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification
– not raisedchanged: ●●● · F07 · programme p. 158

A general 25% pay rise in the social sector.

“We will carry out a general 25% pay rise in the social sector.”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification

3.5 Education

– not raisedchanged: ●●● · O01 · programme p. 164

The school-leaving age is raised to 18.

“We will raise compulsory schooling to 18.”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification
✔ fulfilled · fullchanged: ●○○ · O02 · programme p. 164

A separate Ministry of Education is set up.

“We will make education a sector of national strategic importance and set up a separate Ministry of Education.”

The ministry also handles children's affairs.

Evidence (1)
History (1)
  1. ↗ ✔ fulfilled · full
◐ in progress · partialchanged: ●●● · O04 · programme p. 164

The National Core Curriculum is amended in agreement with teachers, and the state textbook monopoly is ended.

“In agreement with teachers we will amend the National Core Curriculum and end the state textbook monopoly.”

Minor amendments; there is no document on ending the state textbook monopoly.

Evidence (2)
History (1)
  1. ↗ ◐ in progress · partial
◐ in progress · tokenchanged: ●●○ · O05 · programme p. 10

The Klebelsberg Centre is reshaped, and head teachers get real employer and financial powers.

“We will radically reshape the operation and powers of the Klebelsberg Centre, restore respect for teachers, and give head teachers real employer and financial powers.”

An investigation and preparation so far.

Evidence (2)
History (1)
  1. ↗ ◐ in progress · token
◐ in progress · partialchanged: ●●● · O06 · programme p. 164

University autonomy is restored, and the foundation (KEKVA) university model is ended.

“We will restore the autonomy of universities and end the KEKVA model.”

The foundation model has not ended yet.

Evidence (2)
Related documents (1)
History (1)
  1. ↗ ◐ in progress · partial
○ no data●●○ · O07 · programme p. 164

Hungarian universities and researchers can again take part in the Erasmus and Horizon programmes.

“We will again make it possible for Hungarian universities, research institutes and researchers to take part in the Erasmus and Horizon programmes.”

The act linked to EU funds was adopted, but there is no document on the return to Erasmus/Horizon.

Related documents (1)

3.7 Equal opportunities

– not raisedchanged: ●●○ · Q01 · programme p. 184

An Ombudsman for Equal Treatment is created.

“We will create the institution of an Ombudsman for Equal Treatment”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification
– not raisedchanged: ●○○ · Q02 · programme p. 184

Period poverty is ended (access to free hygiene products).

“We will end period poverty”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification

3.10 Culture

○ no data●●○ · Q03 · programme p. 197

A party-neutral National Press Fund is set up to support the press.

“We will set up a party-neutral National Press Fund to support print and digital press.”
– not raisedchanged: ●●○ · Q04 · programme p. 197

A general 25% pay rise in the cultural sector.

“We will introduce a sector pay reform, a general 25% pay rise and a predictable multi-year pay scale”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification

4.1 Environment

◐ in progress · tokenchanged: ●●○ · Y01 · programme p. 205

MOHU's 35-year waste management concession contract is reviewed.

“We will review MOHU Zrt.'s 35-year waste concession contract”

There is no document on the result of the review.

Evidence (1)
History (1)
  1. ↗ ◐ in progress · token
◐ in progress · tokenchanged: ●●○ · Y02 · programme p. 205

Separate environmental, nature conservation and water protection authorities are rebuilt.

“we will rebuild the separate nature conservation, environmental and water protection authority system”

A decision and a draft; the authority does not exist yet.

Evidence (2)
History (1)
  1. ↗ ◐ in progress · token
◐ in progress · tokenchanged: ●●○ · Y03 · programme p. 205

A separate body is set up to continuously monitor heavily polluting industries, especially battery plants.

“We will set up a separate body to continuously monitor heavily polluting industries and activities, especially battery industry investments.”

There is no separate body dedicated to this yet.

Evidence (2)
History (1)
  1. ↗ ◐ in progress · token
◐ in progress · partialchanged: ●●○ · Y04 · programme p. 205

Environmental rules are enforced more strictly, and polluters are sanctioned quickly.

“We will strictly check compliance with environmental rules and sanction polluters quickly and effectively.”

A published decree tightens environmental fines; stricter inspection and quick sanctioning are not yet visible.

Evidence (3)
History (2)
  1. ↗ ◐ in progress · token
  2. ◐ in progress · partial
– not raisedchanged: ●●○ · Y05 · programme p. 205

Decisions of the past 16 years on carbon emission allowance trading are reviewed.

“We will review the decisions of the past 16 years on carbon allowance trading.”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification

4.2 Agriculture

– not raisedchanged: ●●○ · X01 · programme p. 218

The land trade act is reviewed, and young people and families who actually farm get priority for state land.

“We will review the Land Act”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification

4.3 Animal welfare

– not raisedchanged: ●●○ · X02 · programme p. 223

A national animal welfare authority is set up with powers to inspect and seize.

“We will set up an animal welfare authority with national powers”

No monitored document has dealt with it since 12 April 2026.

History (1)
  1. – not raised · methodology reclassification
○ no data●○○ · X03 · programme p. 223

A single national animal register database is set up.

“We will set up a single, national animal register database.”

4.4 Rural development

○ no data●●○ · X04 · programme p. 228

HUF 1 billion a year in community development funds per ten villages, on top of the Hungarian Village Programme.

“We will give a community development budget of one billion forints a year per ten villages, on top of the funds of the Hungarian Village Programme.”

The Saint Stephen Rural Development Programme started (up to HUF 12 billion in 2027), but there is no data on the structure promised in the programme.

Related documents (1)

4.5 Digital state

○ no data●●○ · X05 · programme p. 233

A comprehensive cybersecurity audit at every state institution and critical infrastructure.

“We will carry out a comprehensive cybersecurity audit at every state institution, application and critical infrastructure.”